CASE STUDY • Student Housing

University Village Towers

Riverside, CA

Project Overview

  • 20 units completed in only 20 days
  • We occupied 2 floors totalling in 20 units
  • Each unit were 4 bedroom, 4 bath
  • Scope included

• Paint

• Flooring

• New Cabinet Fronts

• Countertops

• Backsplash

• Fixtures 

• Appliances

Your Preferred Student Housing Partner

20

units in 20 days

23,600

sq ft of renovated space

12,978

sq ft of flooring

400

gallons of paint

20 4x4 units renovated in 20 days, just in time for students to move in to start their school year.

Two floors of apartments with two different crews working simultaneously.

Multi-disciplined team members ensure all work is done on time, on budget, and with the highest standards.

Faster turn-around times means our clients have less days of unoccupied units.



Construction Management

With a fast turn-around we ran two crews over the 20 days, all while managing deliveries, installations, and making sure we finished with enough time for cleaning crews to make sure units were move-in ready.

  • Three men are standing in a hallway talking to each other

    Slide title

    Write your caption here
    Button
  • Two men are working in a kitchen and one of them is wearing a hat with the letter h on it

    Slide title

    Write your caption here
    Button
  • A kitchen with white cabinets and a stainless steel dishwasher

    Slide title

    Write your caption here
    Button
  • A man with an american flag on his shirt is standing in a kitchen

    Slide title

    Write your caption here
    Button
  • A man is painting a wall in a bathroom

    Slide title

    Write your caption here
    Button
  • A man in a black shirt is walking through a doorway

    Slide title

    Write your caption here
    Button
A kitchen that is being remodeled with white cabinets
A kitchen with a stove a sink and a microwave

Value Add

From due-diligence and helping our clients make an informed decision with regards to their acquisitions, to design-build collaboration, to adding value with upgraded materials, URC is your preferred student housing partner for turning your vision into reality.

As an operator, you need a construction partner that provides in-depth industry knowledge, risk insight, and a comprehensive approach to estimating and scope development. You also need a partner that is looking out for you. We are proactive in our communications, transparent in execution, and always aligned with our clients to become a valuable partner in success.

-WHY

URC?

Construction workers at a house renovation site, one standing in front of the porch and one working with tools.
01

Single Point of Contact

One project lead from scope development to final closeout. No handoffs. No gaps.


Two coworkers reviewing a computer monitor in a modern office.
02

In-House Procurement

and Scheduling

Materials arrive on time because we manage the supply chain directly, not through intermediaries.

Worker in orange safety vest climbing indoor stairs in a building stairwell
03

Occupied Property Expertise

Phased scheduling, coordinated access, and resident-aware execution are standard on every job.

Construction worker in hard hat using a tablet at a building site with dirt piles and houses in the background
04

Proprietary Technology

Our tracking system gives every project manager real-time visibility into every unit in progress, keeping cycle times tight and clients informed.