Hospitality
Field Station - Moab, UT
- Number Rooms: 139
- 2 story garden-style with interior corridor access
- Originally built in 1979
- Budget: 7.2mm
- Construction Time: 18 months
100% Project Reposition
In the heart of the Mountain West region, URC West successfully executed a complex hospitality renovation project for Autocamp/Whitman Peterson in Moab. With a focus on repositioning, this 139-key, two-story garden-style property underwent a comprehensive 18-month transformation, breathing new life into its 1979 vintage structure.
The Team
Senior Project Manager
- Keri-Ann Parris
Construction Managers:
- Jeff Perris
- Armando Coss
- Austyn Rodriguez
Project Coordinator
- Katy Zapata
Project Accountant
- Andy Gajipara
Architect: Architectural Squared
Designer: CID
Casework: Rais/ Stageplan

139
Units
36,265
Square Feet - Building Footprint
2,725
Square Feet - Lobby
1,081
Square Feet - Meeting Space
Project Scope
Interior
139 Rooms: Comprehensive interior renovation of all 139 rooms to modernize and enhance guest comfort.
- Casework: Installation of custom-built casework to optimize storage and aesthetics.
- OSE (Operable Wall Systems): Incorporation of operable wall systems for flexible space utilization.
- Aquawalls Shower System: Introduction of cutting-edge Aquawalls shower systems for an elevated guest experience.
- LVT (Luxury Vinyl Tile) Flooring: Replacement of flooring with durable and stylish Luxury Vinyl Tiles for a modern look.
- ACM Abatement : Application of ACM (Aluminum Composite Material) abatement for aesthetic enhancements and durability.
- New MEP Fixtures: Upgrade of Mechanical, Electrical, and Plumbing fixtures to meet modern standards.
- Floorplan Modifications: Strategic adjustments to the floorplan for improved functionality and aesthetics.
- Fire Suppression System: Implementation of an advanced fire suppression system for enhanced safety.
- Addition of 4 New ADA Rooms: Inclusion of four new ADA (Americans with Disabilities Act) compliant rooms for accessibility.
Exterior
- Renovation of Existing Pool and Equipment: Revitalization of the pool area and upgrade of associated equipment.
- Custom Fencing: Installation of custom-designed fencing for both aesthetic appeal and security.
- Custom Concrete Decking and Flatwork: Creation of bespoke concrete decking and flatwork for outdoor spaces.
- Custom Steel Trellis System: Construction of a distinctive steel trellis system for architectural interest.
- Custom Fireplace: Installation of a custom-designed fireplace for outdoor ambiance.
- Custom Sea Container Storage and Modifications: Adaptation of sea containers for unique storage solutions.
- Entry Porte’ Cochere: Development of an impressive entry Porte' Cochere for a grand arrival experience.
- Exterior Cedar Cladding: Application of cedar cladding for a natural and aesthetically pleasing exterior.
Public Space
- Major Steel Structural: Reinforcement and enhancement of major steel structural elements for longevity.
- FLS Systems: Implementation of Floor Leveling Systems for even and durable surfaces.
- All New MEP: Comprehensive replacement of Mechanical, Electrical, and Plumbing systems to meet modern standards.
- Storefront Systems: Installation of storefront systems for enhanced aesthetics and natural light.
- Custom Millwork and Casework: Introduction of custom millwork and casework for unique and functional public spaces.
- Custom Slat Ceiling: Construction of a custom slat ceiling for architectural interest.
- Polished Concrete Flooring: Utilization of polished concrete flooring for a sleek and contemporary look.
- Full Audio/Video: Integration of state-of-the-art Audio/Video systems for a modern entertainment experience.
- Design and Build Out of Food and Beverage: Creation of functional and stylish food and beverage spaces.
- Full Title 24 MEP Modifications: Compliance with Title 24 regulations through comprehensive Mechanical, Electrical, and Plumbing modifications.
- Added ADA Restrooms: Inclusion of additional ADA-compliant restrooms for accessibility.
General Deferred & Building Improvements
- Exterior Stucco/Paint: Application of new stucco and paint for a refreshed and updated exterior.
- Full Plumbing Re-pipe: Comprehensive re-piping of plumbing systems for efficiency and longevity.
- Full Fire Suppression System: Overhaul and upgrade of the entire fire suppression system for enhanced safety.
- Commercial Boiler Replacement: Replacement of the commercial boiler for improved efficiency.
- Site Lighting: Upgrade of outdoor site lighting for safety and aesthetics.
- Corridor Renovation: Renovation of corridors for a cohesive and modernized interior aesthetic.
- Flooring: Replacement or refurbishment of flooring throughout the property.
- Wall Cladding: Installation of new wall cladding for both functional and aesthetic purposes.
- Drop Ceiling: Replacement or modification of drop ceilings for improved aesthetics and functionality.
- Lighting: Upgrade or replacement of lighting fixtures for improved efficiency and aesthetic

Project Challenges
This transformative hospitality renovation in Moab presented a series of formidable challenges that URC West adeptly navigated.
- The remote project location demanded meticulous logistical planning for the transportation of materials and the mobilization of our workforce.
- Overcoming the hurdle of limited local labor and subcontractor resources required strategic human resource management and a concerted effort to broaden our recruitment scope.
- Tackling the intricacies of shipping and storage logistics was crucial to ensure the seamless availability of materials.
- Providing suitable crew housing in this remote setting was an essential aspect of our commitment to the well-being and efficiency of our team.
- Unpredictable weather conditions, a constant consideration, demanded flexible scheduling and contingency plans. Additionally, meeting the stringent requirements of building code upgrades demanded precision and a comprehensive understanding of evolving regulations.
Despite these challenges, URC West executed this project with unwavering dedication, showcasing our resilience and expertise in the face of adversity.
In-House Team Give Us The Edge
URC West's in-house procurement team ensured materials arrived onsite and on time despite logistical challenges.
- In house- framing
- Strong subcontractor relationships/network means that we go where you need us
- Sourcing raw materials for custom furniture
- Landscaping
- Hardscape
- In-house plumbing & electrical





